Business

Morz and BP Zhuhai expand relationship

Strauss was chief engineer in charge of overall design and construction of the bridge project.However, because he had little understanding or experience with cable-suspension designs, responsibility for much of the engineering and architecture fell on other experts. Strauss’s initial design proposal (two double cantilever spans linked by a central suspension segment) was unacceptable from a […]